Company formation and compliance in 42 countries — every fee shown separately, read from the authority that charges it. See what we deliver

Comriq.

Patent Registration in Seychelles

Seychelles patent prosecution with the Registrar General under the Industrial Property Act 2014, which also provides for utility certificates and industrial designs; the Registrar maintains a separate patent register. Seychelles is a contracting state of the Patent Cooperation Treaty, so an international application can enter the Seychelles national phase. A 20-year term is the standard understanding under the Act.

Typical turnaround

10–30 business days

SCBilled in

SCR

What we will need from you

Upload these once. They are stored encrypted and reused across every service you buy from us.

  • Specification, claims, abstract and any drawings

  • Inventor and applicant details

  • Priority document, or the PCT international application for national-phase entry

    Seychelles is a PCT contracting state, so a national-phase entry route is available.

  • Local agent, if required for a foreign applicant

    Whether a foreign applicant must act through a local agent should be confirmed from the Industrial Property Act 2014 and the Registrar General.

Cost breakdown

Our fee and the government’s are always separate lines. Government fees are passed through at exactly what the authority charges — we add nothing to them.

Patent filing, grant and renewal feesonly if it appliesNo amount published here.Confirmed before payment
Comriq professional feeFixed fee within 1 business day

How it runs

You will see these exact stages update in your client portal as we progress.

  1. Drafting

    Specification and claims drafted, or the PCT international application prepared for Seychelles national-phase entry.

  2. Application Filed

    Filed with the Registrar General under the Industrial Property Act 2014 and entered in the patent register. Official fees are confirmed with the Registrar General at filing — no schedule is published here.

  3. Examination

    Examination handled under the Industrial Property Act 2014. The Registrar General publishes no timeline that could be confirmed; the window shown is a conservative Comriq delivery estimate for our work, not a statutory SLA.

  4. Grant

    Grant entered in the patent register. A 20-year term is the standard understanding under the Act and is confirmed against the Act at quote; utility certificates and industrial designs are alternatives under the same Act.

Indicative guidance — confirmed before payment

Requirements and statutory fees are set by Registrar General — Intellectual Property Office, Registration Division, Department of Legal Affairs and change without notice. This page is general information, not legal or tax advice. Your engagement letter and quote are the binding documents.